Samsun Metropolitan Municipality (SMM) has been applied to the Renewable Energy Funding Program,

Samsun Metropolitan Municipality (SMM) has been applied to the Renewable Energy Funding Program, which is opened by Middle Black Sea Regional Development Agency (OKA), for two separate projects as a result of the studies prepared within the framework of the subheading1.2. Funding Opportunities, Programs and Political Initiatives located at the Group Activity I Analysis of Current External Situation Studies completed under BSBEEP Project, which has been implementing in the scope of ENPI, Black Sea Basin Joint Operational Programme 2007-2013 in Samsun.

Project I:

“samSUN Solar Energy Project”
As part of the Project, to Samsun Blue Lights Training, Relaxation and Rehabilitation Center-Camp, establishing 8 unit and each is 6 kWh in total 48 kWh power solar energy system with solar tracking system is considered. Since solar tracking system that will be used on planned GES Project theoretically brings 30% increase in capacity, being 7.8 kWh in each solar system, producing totally 62,4 kWh electric energy is planned. Solar power plant (SPP) which is planned to be established as part of “samSUN Solar Energy Project” will have the feature of being the first and only facility that generates electrical energy from renewable energy sources among public institutions and organizations both in Samsun and other region provinces.
Solar Energy Power Project 

Project II:

“At Selahattin Ereren Drinking Water Treatment Facility Hydro Power Plant (HPP) Construction Project with Innovative Approaches”,

“At Selahattin Ereren Drinking Water Treatment Facility HPP Construction Project with Innovative Approaches”, the mini-hydro power plant that will be built with renewable methods, on conveyance line brought to Selahattin Ereren Drinking Water Treatment Facility from the basis of Çakmak Dam that provides drinking water requirements of Samsun province and locates in Samsun province Tekkeköy region, it is planned to build infrastructure that will generate 570 kWh electric power.

Hydroelectric plant (HPP) which is planned to be established as part of “At Selahattin Ereren Drinking Water Treatment Facility HPP Construction Project with Innovative Approaches” will have the feature of being the first and only facility that generates electrical energy from renewable energy sources among public institutions and organizations both in Samsun and other region provinces.
Selahattin Ereren HEP Project